|
Design Hourly Volume |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Current |
10 Years |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year |
Later |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
c |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ADT |
|
6915 |
9660 |
|
|
|
|
|
|
|
|
|
|
|
|
|
K |
|
|
|
|
|
|
|
|
|
|
|
|
|
Source |
30th Highest Hour |
15.0% |
1037 |
1449 |
|
|
|
|
|
|
|
|
|
|
|
Figure 2.12, page 50 |
10th Highest Hour |
17.5% |
1210 |
1691 |
|
|
|
|
|
|
|
|
|
|
|
AASHTO Exhibit 2-28 |
Highest Hour |
24.0% |
1660 |
2318 |
Capacity Exceeded |
|
|
|
|
|
|
|
|
|
|
|
Capacity |
|
2000 |
2000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Roadway Design Engineers usually use the K30 DHV for Design and
Analysis |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Traffic Engineers usually use the Peak Season PM
Peak Hour for Design and Analysis |
|
|
|
|
|
|
|
|
|
|
This roughly corresponds to a K100 DHV |
|
|
|
|
|
|
|
|
|
|
Why do we do this? Data is much easier to get. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
K30 |
= |
V30 / AADT |
|
|
|
|
|
|
|
|
|
|
|
|
Example: |
K30 |
= |
1500 / 10,000 |
= 15% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AADT = Average Annual Daily Traffic (a
continuous count for the entire year) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|